Customer Area    |    TR    EN    IT    GE   |    CONTACT

 

  • ANKASANCASTING AND MACHINING COMPANY
1 2 3 4 5
Company News

CMM - Coordinate Measurement Machines We made our purchase agreement. (April 2019)


DEA Global S model CMM will be commissioned by May 2019
Our Customer performed site-visit


We had a change to show our facilities to our customer during their valuable visitation.
ISO 9001:2015 Quality System Certification (September 2018)


ANKASAN was awarded the new quality system certificate by completing the ISO 9001: 2015 Management System Certification audit conducted by Türk Loydu in July.

Automatic Casting Line Investment (July 2018)


In January 2017, Ankasan took the first step for the automatic casting line, which will complete the casting line used.

The automatic casting line, which will be completed in the beginning of September 2018, consists of 3 casting and 1 return line and 17 carriage in 1600x1200 dimensions in each line.

CNC Double Column Machining Center Investment (June 2018)


ANKASAN added a new machine to the machine park. With the new investment made, ANKASAN's processing diversity and capacity increased.

  • -CNC Double Column Machining Center (KAFO KMC-3127)
C axis CNC vertical turning investment (April 2018)


ANKASAN added a new machine to the machine park. With the new investment made, ANKASAN's processing capacity increased by 25%.

  • (HYUNDAI WIA LV 1100 RM)
AD 2000 Merkblatt Documentation (March 2018)


ANKASAN, AD 2000 Merkblatt (design and production standard for pressurized equipment) certification by Türk Loydu in March passed the audit successfully and was entitled to receive the certificate.

450 Electric Motor Body Operation (FEBRUARY 2018)


ANKASAN has started to work on the new Electric Motor Body in the direction of new agreements.
CNC Horizontal Machining Center investment (November 2017)


ANKASAN added a new machine to its machine park. The processing capacity increased by 10% with the investment.
  • (Hyundai WIA KH630G)
Steel Construction Generator Body Production (November 2017)


ANKASAN started to produce Steel Construction Generator Body with signing an aggrement with its customer. Expanding its product range with this part, ANKASAN has set the goal of opening a steel construction factory in 2018. (The weight of each part is 5.750 kg, 2.650 kg, 2.550 kg.)
450 Electric Motor Body Production (October 2017)


ANKASAN has added a new piece to its product range. The casting of 1.250 kg Electric Motor Body was successfully completed and shipped to our customers.
Machining Plant (April 2017)


Ankasan has completed the investment of the new machining plant in order to better serve the customers
ANKASAN made an invesment of Automatic Furan Moulding Line (January 2017)


The moulding line has the sizes 1600x1300x500x500. Daily production 90 degree moulding capacity allow us to speed and qualify our production. ANKASAN will add casting line to the existing moulding line to make the production fully automated at 1st quarter of the 2018. The invesments on the casting line will help us to increase daily production degree to 120.
ANKASAN has added a new equipments to its laboratory (January 2017)


Our company keep its quality policy and objectives in accordance with the casting process and the quality of products fully under control and to begin R & D activities were incorporated by metallography microscope and sample preparation equipment.
ANKASAN quality control team began non-destructive testing training


ANKASAN aims to keep staff within field of non-destructive testing to meet customer need and objectives in order to move to a higher level of quality. Ankasan quality team's training on field of non-destructive test already begun to success the aim.
Our Customer performed site-visit


We had a change to show our facilities to our customer during their valuable visitation.
Fire Drills


Fire Drills was held on 2014/07/09, has resulted in educational achievement.

Education comprised the simulation of fire and fire extinguishing technics. Aim of drills also to teach employees how should act in case of real fire.

We thank our valued employees who attended training.
ANKASAN successfully completed his Romanian business trip


ANKASAN team whose successfully completed Romanian business trip had a chance to compare notes with his customers.
ANKASAN expanding his machine park investment


ANKASAN bought two more machinary to speed up the production and increase the quality process's certanity.
  1. FTL Molding Line (20 TONS/ mixer capacity per hour),
  2. You Ji CNC Vertical Lathe + C Axis (1.200 mm machining capacity)
ANKASAN's staff have completed "General Casting and CNC Technology" education


The education which comprised the CNC Technologies and New Casting Technics completed at 20.12.2014.
ANKASAN has achieved a first in his history of production


ANKASAN has achieved a first in his history of production with performing of the 3.000 Kgs single piece casting.

ANKASAN team doubled his proud and success with has approval about the quality of the product, and ANKASAN continues with sure steps to the path with the customer who is the world leader in the sector.
Our customer visited our factory


Our coalition would greatly appreciated by our customer visitation. We want to thank you for taking the time out of your busy schedule to discuss the matters.
EHS Audit


ANKASAN succesfully completed the EHS audit which performed by customer.
Fire Drills


Fire Drills was held on 05.26.2014, has resulted in educational achievement.

Education comprised the simulation of fire and fire extinguishing technics. Aim of drills also to teach employees how should act in case of real fire.

We thank our valued employees who attended training.
Waste and Environmental Education


Waste and Environmental training training was conducted in April 2014 on our company.

Employees have been informed about Waste Management and Enviromental factors and its consequences.

We thank our valued employees who attended training.
Occupational Health and Safety


Occupational health and safety training was conducted in April 2014 on our company.

The scope of the training to realize our employess aboout importance of the implementation of the decisions taken in the framework of this policy can create consequences as lifesaving.

We thank our valued employees who attended training.
Environmental Permits Certificate


Governorship of Ankara Provincial Directorate of Environment and Urbanization environmental covered by the regulations permit was given to ANKASAN.

Please follow the link to see given permit certificate

Order Tracking System


ANKASAN Order Tracking System version 2 software have started to coding. Click here to see the current system.
Customer Visit


We perform business trip to Italy. Our goal is customer satisfaction measures in place and to exchange ideas for new business pitches, respectively. Many fruitful exchange of ideas during our trip we did. (10.2013)




@ ANKASAN 2013